Applied Materials is hiring a Work Center Planner 1 to plan and control scheduling for low-complexity manufacturing lines, accounting for business demand and manufacturing and material constraints. The role is responsible for line on-time delivery and tool configuration and slotting, and supports efficient line design, capacity fulfillment, training allocation, and continuous improvement of line performance. The position has no supervisory responsibilities and is accountable for developing a technical contribution. It applies established procedures and practices to meet objectives and deadlines, with limited impact beyond the immediate work team. The role is based in Kalispell, Montana, is full time, and does not require travel. Relocation is not available.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
No Education Listed