This leadership position is responsible for the management and oversight of the daily operations of Bethel Wind Facility; a 276.0 MW wind facility, owned by Southern Company’s subsidiary Southern Power, located in Castro County, Texas. The wind farm is equipped with 120 GE wind turbines rated at 2.3MW each. This candidate will lead a small team of technicians and third-party wind contractors and will work to establish new operating procedures and will work closely with the rest of Southern Power to communicate and manage the site operations.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
High school or GED