The Wastewater/Maintenance Technician operates, maintains, and controls the Wastewater Pretreatment Plant (WWTP), monitoring equipment, gauges, charts, water-quality data, and chemical-testing results to ensure wastewater is properly treated before release to the municipal wastewater facility. The role also provides off-shift maintenance support throughout the main facility and responds to Central Utilities Building needs, including boilers, chillers, air compressors, and purified-water systems. The position involves safe handling of treatment chemicals, attention to environmental and safety requirements, and flexibility to support plant operations across shifts. The position is based at Sumitomo Biorational’s manufacturing site in Osage, Iowa. The 5th Shift schedule is Friday and Saturday, 6:00 p.m.–6:30 a.m., plus one weekday. Employees must remain available for other shifts as directed, including weekends, holidays, and on-call assignments. The role may involve hazardous chemicals and spills, wastewater, extreme temperatures, elevated work areas, and other industrial conditions. Appropriate PPE is required. Sumitomo Biorational is a worldwide developer and manufacturer of biorational products for agriculture, public health, and forestry. It is a wholly owned subsidiary of Sumitomo Chemical. The company describes sustainability and corporate social responsibility as central to its culture.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
High school or GED