About The Position

The Transmission Planning Analysis Engineer independently conducts studies on transmission systems ranging from 34.5 kV to 345 kV to assess operational reliability, adequacy, and security under FERC 715. The work covers power-flow, dynamic-stability, transient-stability, and voltage-stability analysis. The role performs and supports NERC and FERC compliance studies, evaluates transmission plans and projects, and works with MISO and Indiana utilities and cooperatives on regional and statewide transmission planning. It also supports regulatory audits and provides assistance to the Transmission Operations Control Center during emergencies and system restoration.

Requirements

  • Bachelor's degree or equivalent experience in mechanical engineering, electrical engineering, or a similar field.
  • At least 2 years of experience working in the electric utility industry.
  • Ability to perform analysis and prepare engineering deliverables without supervision.
  • Passing grade on the Fundamentals of Engineering exam.

Nice To Haves

  • Bachelor's degree, certificate, or equivalent experience in power-systems studies.
  • Proficiency in report writing, analysis, and compliance procedures.
  • Detailed understanding of regulatory frameworks, including NERC, FERC, and PJM/MISO.
  • Ability to communicate complex ideas verbally and in writing.
  • Proven technical knowledge and understanding of the transmission grid.
  • Proficiency with PSS®E, TARA, DSA Tools, or similar software.
  • Proficiency with ASPEN, CAPE, or similar software.
  • Proficiency with PSCAD or similar software.

Responsibilities

  • Perform the annual NERC TPL-001 Transmission System Planning Performance Assessment using steady-state, short-circuit, and dynamic power-system techniques.
  • Assist with the NERC EOP-005 System Restoration from Blackstart Resources assessment using transient power-system techniques.
  • Independently perform the annual NERC CIP-014 Physical Security assessment, modeling realistic and historical physical attacks on transmission equipment and assessing potential instability, uncontrolled separation, or cascading.
  • Perform, as requested, NERC FAC-002 qualified-change and material-modification impact studies for new or modified loads, generation, and transmission facilities.
  • Evaluate transmission-system optimization and proposed transmission plans to reduce investment while using relevant and emerging technologies, including GETs.
  • Participate in MISO regional transmission-planning stakeholder meetings, plan projects, and evaluate MISO Expansion Transmission Plan projects for effective and efficient evaluation and just and reasonable scope.
  • Participate in stakeholder meetings and, with assistance, plan and evaluate MISO Expedited Project Review and Expedited Resource Adequacy Study projects.
  • Collaborate with Indiana's five vertically integrated investor-owned utilities and two generation and transmission cooperatives to develop a cost-effective forecasted transmission plan that reliably serves existing and new customers.
  • Prepare for and defend against regulatory audits, including audits by NERC, IURC, FERC, and MISO, regarding tariff and NERC compliance.
  • Assist the Transmission Operations Control Center during emergencies, including extreme weather, emergency repairs, and system restoration.
  • Assist with tasks related to NERC standards, including TPL-007, TPL-008, FAC-003, FAC-010, FAC-011, FAC-014, PRC-012, and PRC-026.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service