Testing and Commissioning Integration Lead - LRT

Parsons CorporationEdmonton, AB
Onsite

About The Position

Parsons is looking for a talented Testing and Commissioning Integration Lead to join the Edmonton Valley Line West LRT project. This role is part of the Critical Infrastructure team, focusing on completing a significant transportation project that will redefine the community's transportation landscape. The company fosters an innovative culture that empowers employees to achieve their full potential, guided by a leadership vision of valuing people, embracing agility, and fostering growth.

Requirements

  • Bachelor's Degree in electrical engineering or construction-related field, or equivalent construction-related work experience
  • 5+ years of experience in field construction
  • Technical knowledge and experience in the commissioning of Transit Rail Systems in at least one major system (Signaling, Communications, Track, SCADA, overhead catenary, tunnel ventilation, etc.)
  • Excellent interpersonal and oral/written communication skills
  • Demonstrated commitment to Goal Zero safety program
  • Valid Class 5 license; clean abstract preferred
  • Ability to negotiate the terrain of an in-process construction site, including climbing stairs and ladders, steep/ slippery terrain, walking, and working outdoors in all types of Edmonton weather and conditions

Nice To Haves

  • Experience in the construction of large civil/structural and/or rail projects is preferred.

Responsibilities

  • Develop SIT test procedures and P.Eng Stamp
  • Review all requirements to develop dynamic testing procedures involving multiple systems
  • Work with design to develop construction staged testing strategy (P1, TZ1, TZ2, Regression)
  • Review ICDs against design requirements for Validation method
  • Review with T&C team subsystem requirements for SIT and interface staging against construction stages
  • Derive requirements from project functional plans Gerry Wright OMF Building B Parametric Programming report Requirements & Derived requirements for SIT & SIT/LRV Power System Study - Requirements & Derived for SIT, SIT& LRV
  • Manage and update project Systems configuration state document - against project discussions and developments
  • Review operational DDCRs and refine validation methods against location & readiness
  • Develop pre-requisites for T&C and manage schedule for readiness for major system SITs
  • Develop and work with performance demonstrations criteria
  • Be part of T&C on site during testing, organize readiness and drive works
  • Produce and stamp SITs including, but not limited to: Line of sight - distance reaction times, Headway, min max operational speed in each section/ direction/ failure, Acceleration / deceleration characteristics with AW loading, Dynamic tests proving RAMs, Degraded mode operations SIG, POWER, Track, Comms - Against operation processes, Series - multiple LRV tests, load monitoring, harmonics, failure and rescue scenarios, Any testing against SOPs

Benefits

  • health
  • vision
  • dental
  • employer paid provincial care premiums
  • Defined Contribution Pension Plan (DCPP)
  • Tax-Free Savings Account (TFSA)
  • Registered Retirement Savings Plan (RRSP)
  • life insurance
  • paid time off
  • sick leave
  • all province observed holidays off
  • gym membership discounts
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service