Venture Global LNG (“Venture Global”) is a long-term, low-cost provider of American-produced liquefied natural gas. The company’s two Louisiana-based export projects service the global demand for North American natural gas and support the long-term development of clean and reliable North American energy supplies. Using reliable, proven technology in an innovative plant design configuration, Venture Global’s modular, mid-scale plant design will replace traditional designs as it allows for the same efficiency and operational reliability at significantly lower capital cost. We are seeking a Technician, Laboratory to join our team at the CP2 LNG Facility that is in Cameron, Louisiana. Successful candidate may be required to train at any of the other Venture Global facilities for a duration of 3-6 months. This role reports to the Laboratory Supervisor and will be responsible for progressing the Ready for Operations (RFO) activities, ensuring seamless transition of the facility from EPC to the operations phase. This entails assisting with commissioning activities of lab equipment and instrumentation, in validating procedures and work instructions for testing, analysis reporting and chemicals management. The incumbent will be responsible for conducting the analysis of samples for a typical LNG plant, analysis of which shall include, but not necessarily be limited to: Natural Gas Composition, and impurities testing. LNG composition (Before and after treatment) Refrigerant composition Dewpoint (Natural Gas & other gases) Utility Water (produced, waste, cooling) Testing of other plant utilities Amine testing Environmental Waste Streams Cargo Certificates of Analysis The incumbent shall also be familiar with sampling procedures and associated laboratory equipment to perform analysis of the above components.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level