Technical Program Manager, Atmospheric & Advanced Packaging

Brooks Automation•Fremont, CA
•$110,622 - $149,665

About The Position

Brooks Automation is hiring a Technical Program Manager to own the integrated technical and program execution of complex atmospheric automation and advanced-packaging programs. The role turns changing customer needs, system architecture, product configurations, engineering work, global supply constraints, and field conditions into credible commitments and predictable business outcomes. It requires technical engagement sufficient to challenge assumptions, lead reviews, control configuration and change, and drive decisions without replacing Engineering’s technical authority. The position leads new-platform, product-extension, and customer-customization programs across their full lifecycle, from requirements and feasibility through design, builds, verification, production transfer, shipment, installation, qualification, ramp, field stabilization, and closure. It also helps strengthen Brooks’ enterprise Program Management operating system through disciplined planning, readiness, configuration control, governance, and evidence-based decisions. The role is customer-facing and cross-functional, coordinating teams across engineering disciplines, product management, applications, operations, supply chain, quality, service, suppliers, OEM partners, regional teams, and customers. It requires periodic travel to company sites, suppliers, manufacturing locations, OEM partners, and customer facilities, as well as collaboration across North American, Asian, and European time zones. Work arrangements may include a mix of in-office and remote work, depending on role needs and business requirements. The base salary range is $110,621.72 to $149,664.68 USD. The position is also eligible for an annual discretionary bonus. Benefits listed for the position include medical, dental, vision, and disability insurance; a 401(k) plan; company-paid holidays; and Flexible Vacation for exempt employees, subject to applicable eligibility requirements.

Requirements

  • Bachelor’s degree in Mechanical, Electrical, Software, Systems, Mechatronics, Manufacturing Engineering, or a related technical discipline.
  • At least 6 years of experience spanning technical program management, systems engineering, product development, engineering leadership, applications engineering, or operations.
  • At least 3 years owning complex cross-functional programs.
  • Direct experience with semiconductor capital equipment, factory automation, robotics, advanced packaging, mechatronics, medical devices, aerospace, or similarly complex electromechanical hardware/software systems.
  • Technical fluency in systems involving mechanisms and structures, precision motion or robotics, end effectors, electrical controls, sensors and vision, embedded or application software, safety systems, manufacturing, and field integration.
  • Ability to read and interrogate requirements, configurations, BOMs, drawings and specifications, interface definitions, FMEA/FEA outputs, verification matrices, test reports and data, defect records, engineering changes, deviations, and manufacturing- and field-readiness evidence.
  • Demonstrated ability to lead technical design and program reviews, question design changes and engineering assumptions, and translate unresolved work into program risk, schedule impact, resource demand, and decision requirements.
  • Demonstrated ownership of integrated master schedules, critical-path management, resource loading and leveling, global dependencies, recovery planning, baseline control, and formal change control.
  • Experience managing customer-facing programs involving evolving requirements, custom configurations, development hardware, field qualification, global installation, and production transfer.
  • Ability to influence without authority and challenge functional leaders, customers, or senior stakeholders using facts, alternatives, quantified consequences, and clear recommendations.
  • Ability to connect technical execution to NRE, product cost, margin, volume, revenue timing, customer value, quality, throughput, yield, and return on investment.
  • Hands-on proficiency with Smartsheet or Microsoft Project, along with Excel, PowerPoint, Teams, SharePoint, and dashboard tools.
  • Clear written and verbal communication across cultures, organizations, and time zones.

Nice To Haves

  • Advanced degree; valued but not required.
  • Experience leading globally distributed teams in Asia, Europe, and North America.
  • Experience with EFEMs, wafer or panel handling robots, end effectors, load ports, aligners, vision/mapping, motion control, industrial software, equipment interfaces, or customer-tool integration.
  • Experience with advanced-packaging substrates, including panels, bonded wafers, film frames, JEDEC trays, heavy or warped payloads, metrology, mapping, and high-throughput handling.
  • Experience recovering a distressed technical or customer program with measurable improvement in schedule, cost, quality, throughput, field stability, or customer outcome.
  • Experience scaling from prototype or customer-specific development to repeatable production, global installation, service readiness, and high-volume demand.
  • Experience improving phase-gate governance, PCM or intake readiness, requirements and configuration control, portfolio prioritization, or executive operating cadence.
  • PMP, PgMP, systems-engineering, quality, Lean, or equivalent credentials.

Responsibilities

  • Lead assigned atmospheric automation and advanced-packaging programs across the full lifecycle, from opportunity and requirements definition through feasibility, planning, design release, prototype and alpha/beta builds, DVT and SQA readiness, production transfer, customer shipment, installation, qualification, ramp, field stabilization, and closure.
  • Establish and control the integrated program baseline, including requirements, acceptance criteria, configuration, interfaces, milestones, critical path, resource assumptions, BOM maturity, cost targets, quality objectives, customer commitments, and decision rights.
  • Build and maintain integrated master schedules across internal functions, regional teams, suppliers, OEM partners, and customers; distinguish requested, target, and approved commitment dates.
  • Convert estimates and functional inputs into executable plans by validating task logic, resource allocations, capacity, material and test lead times, and explicit functional commitments.
  • Own program risk, issue, assumption, dependency, decision, action, and change-control systems; clarify consequences, recovery options, recommendations, owners, and decision dates for problems and risks.
  • Lead evidence-based phase-gate readiness reviews, making incomplete deliverables, residual risks, waivers, deviations, workarounds, defects, and conditional approvals explicit and tracked to closure.
  • Control post-baseline changes by assessing their impact on architecture, interfaces, verification, software, BOM, tooling, documentation, service, schedule, resources, cost, quality, throughput, yield, revenue timing, and customer commitments before approval and re-baselining.
  • Lead customer-facing program, design-readiness, build-readiness, installation, and recovery reviews; constructively challenge unsupported requirements, acceptance criteria, dates, and trade-offs.
  • Prepare concise executive communications covering baseline versus forecast, critical-path movement, configuration maturity, key risks, recovery scenarios, recommendations, and decisions required.
  • Drive program closure, including as-built and as-shipped configuration, manufacturing and service readiness, field actions, verification closure, lessons learned, ownership transfer, and disposition of temporary workarounds.
  • Develop system-level understanding across engineering and operational disciplines and lead reviews linking customer requirements, architecture, interfaces, design maturity, build configuration, verification, manufacturing readiness, field conditions, cost, schedule, and acceptance.
  • Challenge design changes and engineering assumptions by assessing requirements, acceptance criteria, alternatives, affected interfaces, reverification needs, and impacts on performance, reliability, BOM, lead time, tooling, software, documentation, service, schedule, and customer commitments.
  • Reconcile product and configuration information, including selection guides, system requirements, configuration matrices, engineering and manufacturing BOMs, as-built/as-shipped records, software and parameter versions, ECOs, deviations, substitutions, effectivity, and field-upgrade content.
  • Use technical artifacts as program evidence, including customer requirements, architecture and interface documents, drawings, specifications, design reviews, FMEA and FEA, verification matrices, test plans and results, defect records, ECOs, BOMs, build documentation, and field procedures.
  • Ensure field fixes, customer-specific software or parameter changes, workarounds, technical debt, defects, waivers, and undocumented knowledge are captured, reproducible, risk-assessed, assigned, and closed or formally accepted.
  • Translate technical decisions into schedule, cost, quality, throughput, yield, capacity, customer, and business consequences for leadership.
  • Improve front-end readiness by identifying incomplete requirements, selection guides, acceptance criteria, dates, configurations, and resource assumptions before commitments are made.
  • Help define readiness reviews before PCM and ensure PCM receives decision-quality inputs and produces explicit acceptance, rejection, or conditional outcomes.
  • Strengthen configuration and change control across customer requests, product definitions, BOMs, software and configuration files, shipped systems, and field upgrades.
  • Use Smartsheet as the execution source and SharePoint as the governed home for program artifacts; use enterprise data and program views to support decisions.
  • Apply program controls proportionately to novelty, customer exposure, technical risk, and complexity while protecting requirements, configuration, safety, verification, manufacturing readiness, financial exposure, and customer acceptance controls.
  • Reduce recurring execution problems such as firefighting, hidden priority shifts, schedule reconstruction, field rework, unnecessary engineer travel, and reliance on individual heroics.
  • Prepare programs for global production transfer and volume ramp so that manufacturing, installation, and support do not depend on the original engineering team for every system.
  • Lead globally distributed collaboration across North American, Asian, and European time zones.

Benefits

  • Medical insurance
  • Dental insurance
  • Vision insurance
  • Disability insurance
  • 401(k) plan
  • Company-paid holidays for exempt employees
  • Flexible Vacation for exempt employees
  • Annual discretionary bonus
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service