The Power Electronics Engineer, Energy Storage designs and develops power conversion systems for Redwood's next-generation Battery Energy Storage Systems (BESS), including converters that interface with battery packs, battery modules, photovoltaic systems, and the grid for utility-scale and data center applications. This is a fully on-site role at 100 Hooper, San Francisco. The engineer independently owns complex circuit- and system-level problems spanning converter topology selection, power-stage component selection, magnetics design, PCB/PCBA layout, thermal analysis, and validation, adapting existing approaches and precedent to new and unusual design challenges. The role partners extensively with Mechanical, Firmware/Controls, Systems, Compliance, Supply Chain, and Manufacturing teams to take designs from concept through production. Success depends on sound engineering judgment, hands-on lab validation skills, and the ability to resolve ambiguous technical trade-offs with limited direction.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior