The Senior Engineer, System Planning for Virtual Power Plants (VPPs), Non-Wires Alternatives (NWAs), and Flexible Interconnection Strategy supports the development and implementation of advanced distribution planning solutions across Eversource’s electric system. Reporting to the Manager of Integrated Energy Planning (IEP), the role combines traditional distribution planning analysis with emerging grid technologies, customer-side resources, and advanced operational strategies. The engineer works with System Planning, Grid Modernization, Operations, DER Integration, Regulatory, and other internal stakeholders to turn identified system needs into actionable alternatives. The position evaluates NWAs for major capital projects that will be filed with siting boards in three jurisdictions. This includes preparing filing petitions, responding to state-regulator information requests, and serving as a Company witness in proceedings. The engineer also helps the Director of IEP develop and update NWA standards, documentation, tools, and processes. The role supports the Company’s VPP efforts by identifying capital projects that may be deferred through VPP development and coordinating with IEP leadership and customer DER and renewable-program leaders. It also serves as a central System Planning coordinator for Flexible Interconnection policies, procedures, and regulatory filings. The position requires availability for emergency restoration assignments and travel between Massachusetts, Connecticut, and New Hampshire as necessary.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior