Sr. Construction Scheduler (Level III)

APSI Construction ManagementTorrance, CA
$155,000 - $168,000Onsite

About The Position

The Harbor UCLA replacement is a $1.7B multiyear program consisting of various small, medium, and large projects. The current HUCLA medical center hospital is not compliant with the state mandate seismic code, necessitating a replacement new hospital. The program also includes outpatient, support buildings, parking structures/surface lots, a central utility plant, a 12KV/66KV substation, and utility corridor projects. Scoping documents are complete, initial demolition/move management has begun, and major D/B procurement is underway. The entire program is scheduled to finish in the fall of 2027.

Requirements

  • Bachelor’s degree in Civil Engineering, Construction Management, or related field.
  • 5–7 years of scheduling experience on large-scale vertical construction projects.
  • Proficiency in Oracle Primavera P6 and Microsoft Office Suite.
  • Familiarity with Bluebeam or other project review tools.
  • Experience supporting projects of at least $50 million in value.
  • Strong understanding of CPM scheduling concepts and construction sequencing.
  • Ability to support multiple phases or packages within a broader program.

Nice To Haves

  • Previous experience working on OSHPD/HCAI-regulated medical facility projects.
  • Experience with healthcare or public-sector building programs preferred.
  • Working knowledge of earned value and forensic schedule analysis.
  • Exposure to utility and infrastructure coordination within large-scale sites.
  • Ability to collaborate in a joint venture or multi-partner delivery model.
  • Comfortable mentoring junior staff or coordinating small scheduling teams.

Responsibilities

  • Updating and maintaining detailed program schedules using Oracle Primavera P6.
  • Supporting cost and resource loading across various project schedules.
  • Running reports on schedule performance, including cash flow forecasts and earned value metrics.
  • Reviewing contractor baseline and monthly schedule updates.
  • Assisting with the preparation of “what-if” scenarios to assess schedule risk and resequencing impacts.
  • Performing preliminary Time Impact Analysis (TIA) reviews and collaborating on delay resolution.
  • Helping to maintain schedule standards, templates, and controls documentation.
  • Participating in status update meetings and coordination sessions.
  • Supporting senior staff with quality assurance checks on scheduling deliverables.
  • Assisting with change order evaluation related to time and schedule implications.
  • Coordinating closely with cost control and document management teams.

Benefits

  • Health insurance
  • Dental insurance
  • Vision insurance
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service