The Washington Utilities and Transportation Commission (UTC) is seeking to fill the role of one (1) Regulatory Analyst 3 within the Water, Solid Waste, Transportation (WST) Strategic Review section of the Regulatory Services Division. This is a project position and is anticipated to end on June 30, 2027. This position will primarily oversee the billing and payment structures of the Extended Producer Responsibility (EPR), ensure compliance with Senate Bill 5284 (SB5284), ensure compliance with Revised Code of Washington (RCW) 70A.208’s and collaborate with partner agencies to implement SB5284 and RCW 70A.208’s provisions. Although this is a hybrid opportunity, the successful incumbent must reside within Washington state and must be available to report to the Lacey, Washington headquarters building when needed. Moderate travel during and outside normal work hours, throughout Washington state or the United States, may be required. This includes occasional overnight stays.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
Associate degree