QC Manager

Five and Fly•Various Locations, AZ
•Onsite

About The Position

Runs the Contractor Quality Control (CQC) program required by UFGS 01 45 00. Makes sure every definable feature of work passes Three-Phase Control, matches accepted submittals and is documented in RMS. Reports to company management, not the Superintendent, and is the government's main point of contact on quality.

Requirements

  • CQM-C (Construction Quality Management for Contractors) certificate, current (valid 5 years), or obtained within 90 days of award
  • Typically 5–10 years combined as Superintendent, QC Manager, PM, Project Engineer or Construction Manager, including 2–4 years as a QC Manager (per contract)
  • OSHA 30-Hour Construction
  • EM 385-1-1 training (40-hour course, or as the contract specifies)
  • RMS / QCS proficiency
  • Able to pass a background check and obtain installation access

Nice To Haves

  • Bachelor's in engineering, architecture or construction management (some contracts require PE or RA)
  • Roofing manufacturer installer or inspector training
  • RCI or RRO credential
  • Fall Protection Competent Person; First Aid / CPR / AED

Responsibilities

  • Prepare and maintain the CQC Plan: definable features of work, testing plan, personnel letters
  • Review and certify every submittal before it goes to the government; track it in the RMS register
  • Confirm no material is installed before its submittal is government-accepted
  • Review specs, submittals, AHAs, materials and work area with the crew and government QA for Preparatory phase
  • Inspect the first installation of each feature for workmanship, compliance and safety for Initial phase
  • Perform daily checks until the feature is complete for Follow-up phase
  • Conduct pre-install inspections for roofing and wall panels (deck condition, slope, penetrations, moisture)
  • Conduct installation inspections for roofing and wall panels (insulation fastening, adhesive coverage, membrane seams, details, flashings, terminations, penetrations)
  • Inspect wall panels / ACM (framing alignment, air barrier continuity, fasteners, sealants, transitions)
  • Provide QC release for hold points like wall or base flashing installation
  • Schedule and witness required tests (fastener pull-out, uplift, flood or EVT leak testing, air barrier testing)
  • Coordinate manufacturer technical rep visits and final warranty inspections
  • Enter daily CQC reports in RMS: work, inspections, tests, deficiencies, safety observations
  • Maintain the deficiency list and close items with photo evidence
  • Maintain as-builts and assemble closeout documentation
  • Lead weekly QC meetings with the government QA representative
  • Issue RFIs through RMS and track responses
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service