Project Manager CUB

Bayer•Upper Arlington, OH
•$176,000 - $264,000

About The Position

The Project Manager — Central Utilities Building (CUB) / Incinerator / Wastewater Treatment is accountable for planning and delivering utilities and environmental infrastructure within a greenfield API and DP manufacturing campus. Reporting to the API / DP Greenfield CapEx Project Lead, the role leads its assigned scope from design development through procurement coordination, construction, commissioning, performance testing, applicable qualification, and operational handover. The systems must be available and reliable to support campus start-up and sustained operations. The position will ultimately be based in New Albany, Ohio. Initially, significant travel to design firms is required until design and construction teams transition onsite, anticipated in mid- to late summer 2027. Some remote work will also be necessary until an onsite office is established, potentially as early as March 2027. Bayer prefers candidates currently residing in the Eastern or Midwestern United States and offers relocation.

Requirements

  • Bachelor’s degree in Mechanical, Chemical, Environmental, or Civil Engineering, or a related discipline.
  • At least 10 years of relevant engineering or capital-project experience.
  • Demonstrated leadership of major utility, industrial-treatment, or environmental-infrastructure projects.
  • Strong understanding of central utility plants, wastewater treatment, incineration, environmental compliance, process safety, and commissioning.
  • Proven multidisciplinary leadership, contractor-management, commercial awareness, and cost and schedule management skills.
  • Fluent English.

Nice To Haves

  • Experience on projects exceeding USD 500 million.
  • Pharmaceutical or regulated manufacturing experience.

Responsibilities

  • Lead delivery of the Central Utilities Building, utility-generation equipment, technical spaces, and supporting infrastructure.
  • Manage assigned campus utilities, including steam, heating, cooling, chilled water, compressed air, gases, water treatment, storage, pumping, distribution, metering, controls, and connections to user facilities.
  • Oversee the incinerator scope, including waste-feed preparation and transfer, emissions controls and monitoring, and residue-handling interfaces.
  • Oversee wastewater collection, stream segregation, equalization, treatment, monitoring, and discharge systems.
  • Coordinate interfaces with incoming utility services, manufacturing demand, tank-farm operations, site drainage, and waste logistics.
  • Arrange temporary utilities and permanent utility availability needed for construction and commissioning.
  • Establish the area execution strategy, scope baseline, system boundaries, delivery packages, and acceptance requirements.
  • Consolidate utility demand and waste-stream requirements; coordinate capacity, load diversity, redundancy, turndown, reliability, and future expansion with stakeholders.
  • Lead design reviews for operability, maintainability, access, isolation, monitoring, and emergency operating conditions; define interfaces and battery limits.
  • Track changes in manufacturing demand and assess their effects on utility and treatment-system design.
  • Manage delivery against the approved area budget and schedule, including forecasts, progress assessments, and corrective actions.
  • Coordinate procurement packages and long-lead equipment priorities with Project Services; lead technical specifications, bid evaluations, vendor reviews, and equipment acceptance activities.
  • Assess proposed changes for capital cost, lifecycle implications, schedule, capacity, and operating performance.
  • Establish utility-availability milestones linked to manufacturing construction, commissioning, qualification, and start-up.
  • Coordinate with EHS and permitting specialists on permit conditions, emissions limits, discharge requirements, and monitoring obligations.
  • Ensure design inputs address waste characteristics, operating ranges, abnormal conditions, safeguards, process safety, hazardous-waste interfaces, fire protection, emergency response, and safe maintenance.
  • Track compliance-related design commitments and testing requirements through completion.
  • Direct assigned construction activities through delivery partners and resolve equipment, piping, controls, and civil interfaces.
  • Coordinate safe energization, utility introduction, commissioning access, and transition of system ownership.
  • Lead integrated testing of utility generation, distribution, controls, and treatment-system interfaces; coordinate performance testing against approved acceptance criteria.
  • Coordinate qualification of applicable utility systems with Quality and C&Q.
  • Develop contingency arrangements for utility or treatment-system delays that could affect campus start-up.
  • Ensure operating procedures, operator training, maintenance plans, calibration requirements, asset records, and critical spares are ready for handover.
  • Transfer monitoring requirements, permit-related operating obligations, vendor support, and warranties to responsible site functions.
  • Close or formally transfer outstanding defects, residual risks, and post-start-up performance actions, and support system stabilization during campus start-up.

Benefits

  • Health care
  • Vision
  • Dental
  • Retirement
  • PTO
  • Sick leave
  • Possible bonus or incentive compensation
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service