The Production Material Planner is responsible for ensuring the production floor has all necessary materials readily available and staged for production. This role requires close collaboration with material handlers to ensure timely delivery of goods from the warehouse to the production floor. The schedule for this position is Monday through Thursday, 3:00 PM to 1:30 AM.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
High school or GED