The Production Control Planner builds and owns executable annual, rolling, and weekly production schedules for every Velocity vehicle by build number and station. The role translates the approved production plan into realistic labor and equipment loading, material readiness, and manufacturing orders (MOs), including separate build-to-stock MOs for internally fabricated, machined, assembled, and finished components. This is a dedicated planning and production control role, not a BOM specialist, buyer, shop supervisor, or all-purpose expediter. The ideal candidate can step into the role effective January 2027. The planner maintains station capacity and scheduling visibility, coordinates changes with Sales and leadership, and identifies bottlenecks and schedule risks. The role manages vehicle and internal component MOs through release, execution monitoring, and closure; runs release-readiness reviews; tracks shortages and internal processing delays; and coordinates accurate closeout and WIP review with Production and Finance. The planner recommends schedule and capacity adjustments but does not approve nonstandard product changes, unapproved spending, new headcount, or shipment release. The role reports to the Director of Production. During initial implementation, the CEO directly sponsors schedule design, labor-capacity mechanics, and priorities. It is an individual-contributor position with no direct reports. The first 90 days focus on auditing existing planning data and workflows, establishing rolling and frozen schedules and internal MO tracking, and demonstrating reliable manpower loading, reporting, SOPs, and backup coverage.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
No Education Listed