The Jerritt Canyon deposit was discovered in 1972, and the first gold production from the property occurred in 1981. The Jerritt Canyon property contains 30,821 hectares of mining claims located in the mining-friendly state of Nevada. First Majestic acquired the Jerritt Canyon Gold Mine from Sprott Mining Inc. on April 30, 2021. In May 2023, operations were suspended to prioritize exploration and technical studies. Jerritt Canyon is now entering a new phase of evaluation and planning, requiring substantial technical support to advance the work necessary for a potential future restart of operations. We are seeking an experienced Process Control Engineer to support the optimization, reliability, and continuous improvement of process control systems within mining and mineral processing operations. The successful candidate will work closely with operations, maintenance, electrical/instrumentation, metallurgy, and engineering teams to ensure safe, stable, and efficient plant performance. This role will focus on the design, implementation, commissioning, troubleshooting, and optimization of process control systems, including DCS, PLC, SCADA, HMI, advanced process control (APC), instrumentation, and industrial communications networks.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level