POST CONSTRUCTION BMP INSPECTOR

Town of SummervilleSummerville, SC
Onsite

About The Position

Performs post-construction best management practice (BMP) inspections of all residential and commercial stormwater management systems—such as retention ponds, bioretention cells, and permeable pavement— to verify maintenance and proper functioning; generates inspection reports; communicates results including any issues and proposed recommendations; and ensures compliance with NPDES and MS4 performance standards. Responds to citizen inquiries; participates in the Town’s escalating enforcement process for stormwater regulations; builds and maintains a database of BMPs.

Requirements

  • Bachelor's degree in engineering, landscape architect, construction management, or a related field; and two (2) years of related work experience; or equivalent combination of education and experience.
  • Valid South Carolina driver’s license.
  • Must have (or obtain within six (6) months of hire) a certification as a South Carolina Certified Erosion Prevention and Sediment Control Inspector (CEPSCI).
  • Understanding of hydrology; stormwater management practices; local/state environmental regulations (NPDES MS4); Knowledge of Post-Construction BMP practices, methods, operations, and materials regarding stormwater systems.
  • Proficiency with GIS or inspection software and Microsoft Office.
  • Strong communication skills.
  • Ability to read construction plans.
  • Ability to effectively and assertively enforce specifications and regulations in a fair and impartial manner.

Responsibilities

  • Conduct routine and follow-up inspections of permanent stormwater control measures (e.g., wet/dry ponds, swales, wetlands) to ensure compliance with approved plans.
  • Verify that BMPs are functioning according to specifications and check for structural integrity, excessive sediment accumulation, or failing vegetation.
  • Generate detailed inspection reports, documenting findings with photos and checklists for local, state, or federal review.
  • Issue corrective action requests to property owners for required maintenance or repairs, such as removing debris or dredging sediment.
  • Provide technical guidance to developers and property owners, issue notices of violation for non-compliance, and assist with enforcement actions.
  • Inspect for improper illegal dumping or non-stormwater discharges into the system.

Benefits

  • Health insurance
  • Dental insurance
  • SC Retirement System
  • 401k deferred compensation
  • 457b deferred compensation
  • Vacation leave
  • Sick leave
  • Holiday leave (12 holidays)
  • Flexible Spending Account
  • Additional Voluntary Insurances
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service