Plans Examiner Provisional/I/II - C (Electrical- Permitting)

City of Orlando•Orlando, FL
•$31 - $41•Onsite

About The Position

This role involves reviewing construction plans, specifications, and other technical materials to ensure compliance with federal, state, and other construction codes for building and other permits. The position is for electrical permitting. There are three levels: Provisional, I (Licensed), and II (Licensed), each with different requirements and salary ranges. The position is a full-time contract role with benefits similar to regular full-time employees, and contracts are typically renewable for one-year terms.

Requirements

  • Plans Examiner Provisional - C: High School Diploma/G.E.D. Certificate and five (5) years of construction-related experience in electrical; or an equivalent combination of education, training, and experience.
  • Plans Examiner I - Licensed - C: High School Diploma/G.E.D. Certificate. Must possess a valid Plans Examiner License from the State of Florida Department of Business and Professional Regulations Building Code Administrators and Inspectors Board (F.S. Chapter 468) in an approved category or discipline of electrical.
  • Plans Examiner II - Licensed - C: High School Diploma/G.E.D. Certificate. Must possess two (2) valid Plans Examiner Licenses from the State of Florida Department of Business and Professional Regulations Building Code Administrators and Inspectors Board (F.S. Chapter 468) in an approved category or discipline of electrical; or one (1) valid Plans Examiner License and one (1) valid Standard Inspector License from the Florida Building Code Administrators and Inspectors Board (BCAI) in the approved disciplines.
  • Valid Florida Driver's License required for all levels.
  • Plans Examiner Provisional - C: Must apply for and pass the State of Florida certification/licensing examination for Plans Examiner in the assigned category (building, plumbing, mechanical, or electrical) in accordance with Florida statutes as a condition of continued employment. Applicant must obtain a provisional license within 120 days of hire, and the permanent License must be obtained within two (2) years of receiving the Provisional License.

Responsibilities

  • Reviews construction plans, specifications, and other technical material submitted to obtain building and other permits.
  • Determines compliance with all applicable federal, state, and other construction codes in assigned areas.
  • Performs other related work as required.

Benefits

  • Same benefits as Regular full-time
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service