The Planner – Pipe will be responsible for the definition, development, and through-build support of the Production Work Packages. Applying extensive craft knowledge and experience to break down and sequence the engineering design within the 3D model and scheduling software. Define work requirements including budget, logic, task notes and resource, establishing interfaces in accordance with the build strategy, completions and test and commissioning. The role demands strong communication and engagement skills, interacting with Engineering, Production, Test and Commissioning throughout the process. Facilitating formal stakeholder reviews of the plan intent and schedule at PreBuild Reviews, and Plan of the Week. The output is a highly detailed, quality production work package with clear instructions and requirements, this to enable Production to complete the work safe, on cost and schedule. Then supporting throughout the build cycle problem solving and ensuring working on plan and risk identified.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
No Education Listed