The mission of the Sabine River Authority is to enhance the lives of every resident of Toledo Bend by working together with all stakeholders to provide a better quality of life and a healthy atmosphere for growth and development- in three words, “Progress through Unity”. The MEO 1 Heavy operates large and small equipment needed for levee maintenance and repairs, performs manual maintenance and repairs to buildings, equipment, and systems.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
No Education Listed