Reporting to the Study Manager, the Mining Study Principal is the technical lead for the mining, mine geotechnical and mine waste scope of the Sunrise study, through concept, pre-feasibility and subsequent study phases. The role develops the mine plan, is responsible for pit optimization and scheduling, and directs the external mining, geotechnical and tailings consultants who perform specialist design work. The role is accountable for the technical quality, cost, schedule and risk of this scope, delivered through consultants and the project team. The scope includes rock storage and tailings storage facilities, and the role is the position through which owner’s-side accountability for mine waste and dam safety is exercised for Sunrise. All roles at NewRange serve as a courageous safety leader, leading by example and fostering a proactive safety and sustainability culture based on the common values of health, safety, environment, and communities.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior