The FDA Pacific Southwest Laboratory & District Office facility supports laboratory operations including work with controlled biological and chemical agents. The construction project involves two related scopes of work: Vacuum Pump System Replacement and Room 2309 VHP Exhaust Correction. The Vacuum Pump System Replacement involves replacing an old vacuum system with a new unit of matching or greater capacity, including N+1 redundancy, a new control panel integrated with the existing Building Automation System (BAS), and independent isolation valves. The Room 2309 VHP Exhaust Correction involves directly ducting three isolators to the outside via an exhaust fan to address VHP detection systems alarming at levels exceeding safe human exposure thresholds. Both scopes involve critical laboratory systems in an occupied facility, requiring careful coordination with FDA facility management, minimal disruption to ongoing operations, and strict compliance with biosafety and safety requirements.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Career Level
Mid Level
Education Level
No Education Listed