In this role as a Material Planner II, you will plan, schedule and manage the efficient movement of material from receiving or the warehouse to production. Through use of Material Requirements Planning (MRP) systems, develop raw material and scheduling requirements from engineering specifications and production schedules to plan and manage material movement with purchasing, warehouse, and production. While adopting the BAE Systems CMS One Team philosophy, you will interface with internal customers and collaborate cross functionally to drive problem resolution and process changes to improve material on time delivery to the floor. Negotiate lead times with suppliers as necessary, and manage schedule to ensure on-time delivery. Support tracking of material shortages for job orders, kitting, and sub-assemblies based on requirements and/or shift hand-off. Plan and execute production schedules to ensure a controlled flow of conforming material to meet delivery requirement. Balance current and future production plans with manufacturing and program to ensure completion of customer requirements. Establish, monitor, and verify Oracle ASCP system parameters, including buffers and inventory levels by performing audits of line side material. Review, action, and resolve material exception messages in advance of production impact.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level