Crusoe is seeking a Material Planner, Electrical to ensure the production schedule is materially feasible for electrical components. This role involves working with the Master Production Schedule (MPS) and Manufacturing Bill of Materials (MBOM) to run MRP, maintain Clear-to-Build (CTB) status, manage shortages, and oversee supplier forecasts and commitments. Given the long lead times and concentrated supply base for electrical components, proactive management of lead times and anticipation of shortages are crucial for maintaining manufacturing timelines. This position acts as a key link between production planning, inventory management, and strategic sourcing. The ideal candidate will have a strong understanding of MRP logic and BOM structures, be skilled in data-driven scheduling, and perform well in high-accountability environments where early identification of constraints is vital. This is a Full-Time position.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level