Performs Make, Buy, and/or Bill of Material (BOM) planning activities associated with Manufacturing Resource Planning (MRP) transactions. Performs manufacturing activities across one or more manufacturing functions and maintains production systems integrity to optimize inventory and minimize cost. Expedites and optimizes material flow through the supply chain to meet customer requirements. Coordinates with manufacturing and Operations Management to control the shop floor for make parts, analyze and control production schedules and capacity requirements, execute plans, provide timely status, and expedite or develop workarounds to preserve schedules. Coordinates with Supply Chain stakeholders, including Procurement and Operations Management, to establish time-phased plans for procured parts and ensure deliverables meet production schedule requirements. Maintains MRP parameters, including lead times and lot sizes, and coordinates with Engineering and the Change Board Representative on associated BOM changes. Maintains PSA locations and required audits in accordance with MMAS metrics requirements. The schedule is 4x10, Monday through Thursday, 6:00 a.m. to 4:30 p.m., with flexibility to work in different areas as needed.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
No Education Listed