Vast is seeking a Manufacturing Planner, Integration to support development of the systems required to design and build artificial-gravity, human-rated space stations. The role supports manufacturing of Vast’s commercial space station program and is based at the company’s Long Beach, California location. It is a full-time, exempt position reporting to the Production Manager, Integration. The planner develops and maintains production schedules, forecasts demand, assesses resource availability and capacity, monitors inventory and production progress, and coordinates with procurement, supply chain, engineering, quality assurance, manufacturing, and logistics teams. The role identifies constraints and schedule deviations, takes corrective action to support on-time delivery, and pursues process improvements that reduce lead times and improve manufacturing efficiency. The position may require late or weekend work as needed to support critical milestones.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
High school or GED