Performs Make, Buy, and/or Bill of Material (BOM) planning activities associated with Manufacturing Resource Planning (MRP) transactions and carries out one or more manufacturing activities across various functions. Maintains production systems integrity to optimize inventory and minimize costs, and expedites and optimizes material flow through the supply chain to meet customer requirements. Coordinates with manufacturing and Operations Management to control the shop floor for make parts, analyze and control production schedules and capacity requirements, execute plans, provide timely status, and expedite or develop workarounds to preserve schedules. Works with Supply Chain stakeholders, including Procurement and Operations Management, to establish time-phased plans for procured parts and ensure deliverables meet production schedule requirements. Maintains MRP parameters, including lead times and lot sizes, and coordinates BOM changes with Engineering and the Change Board Representative. This position is located in Marietta, Georgia. The posting highlights flexible work schedules, including four-day, ten-hour schedules, and describes Lockheed Martin’s employee benefits and total rewards programs.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior