The Manufacturing / Materials Planner, also known on site as a Production Controller, is responsible for generating a Master Production Schedule (MPS) to meet required output with available capacity and releases job cards in line with the plan. The post holder will also manage shortages to maximize enablement and clear to build in order to drive on time starts and completes to MRP and collaborates closely with Flow Leaders/Production Line Managers to ensure buy-in and adherence to the plan. The applicant must be a good team player, flexible, and be able to work to tight schedules. They will monitor the integrity of job card data to ensure MRP signals are correct.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level