Integrated Master Scheduler

Saronic TechnologiesFranklin, LA
Onsite

About The Position

The Integrated Master Scheduler is responsible for the day-to-day development, maintenance, analysis, and publication of the shipyard's Integrated Master Schedule (IMS) across all active and planned vessels. The IMS provides the portfolio-level forecast for major vessel milestones, vessel sequencing, shared resources, production capacity, facility constraints, and conflicts across the orderbook. The Scheduling & Planning Manager retains overall accountability and approval authority for the portfolio schedule.

Requirements

  • Bachelor's degree in Engineering, Construction Management, Business, or a related field, or an equivalent combination of education and relevant experience.
  • [5–8]+ years of planning/scheduling or project controls experience, including integrated or master schedule ownership, preferably in shipbuilding, marine, or complex fabrication environments.
  • Advanced proficiency in Primavera P6 or similar scheduling software, including multi-project integration and resource- and/or cost-loaded schedules.
  • Strong command of critical path method (CPM) scheduling, earned value concepts, and schedule performance metrics (SV, SPI).
  • Proficiency with Microsoft Office, particularly Excel, for reporting and data analysis.
  • Experience maintaining an integrated master schedule across multiple concurrent new construction vessels or similarly complex programs.
  • Familiarity with capacity planning, facility/berth constraints, and shared-resource management across a portfolio.
  • PMI-SP, AACE PSP, or similar scheduling/project controls certification.

Responsibilities

  • Develop and maintain the Integrated Master Schedule covering all active and planned new-construction vessels at the Franklin, Louisiana shipyard location.
  • Integrate major hull milestones from detailed vessel schedules into a consistent portfolio-level forecast.
  • Maintain common WBS, activity coding, calendars, milestone definitions, data dates, and schedule interfaces across the portfolio.
  • Ensure vessel schedules and the IMS reconcile each update-cycle and that hull-level milestone movement is visible in the site forecast.
  • Model vessel sequencing through major production stages, facilities, and constrained resources.
  • Maintain logic for shared facilities and resources such as jigs, cranes, paint areas, launch positions, test equipment, specialist labor, and other capacity-limited assets.
  • Identify conflicts between vessels, trade stacking, workspace congestion, resource contention, and unachievable capacity assumptions.
  • Evaluate portfolio scenarios and what-if alternatives for vessel starts, phase transitions, facility occupancy, and resource allocation.
  • Support management decisions on production priorities, vessel sequencing, recovery strategies, and capacity requirements.
  • Serve as day-to-day custodian of configuration, schedule logic, calendars, baselines, data dates, forecasting, and schedule calculations.
  • Perform portfolio-level critical and near-critical path analysis, float review, milestone variance analysis, and schedule performance trending.
  • Execute schedule variance and Schedule Performance Index (SPI) analysis where applicable and develop milestone bar charts, S-curves, progress curves, and exception reports.
  • Review open ends, invalid logic, negative float, excessive float, lags, constraints, out-of-sequence progress, and calendar assignments each update cycle.
  • Allow valid logic and remaining duration to drive forecast dates rather than manually moving activities to preserve desired milestones.
  • Develop weekly and monthly portfolio schedule reports, milestone dashboards, critical-path summaries, executive summaries, and recovery-option analyses.
  • Present schedule exceptions requiring priorities, resources, or management decisions.
  • Maintain schedule change, delay/risk, decision/action, and milestone-variance records in accordance with established controls.
  • Maintain the standard vessel schedule architecture, common milestone definitions, interface points, coding, and duration-history framework.
  • Incorporate approved lessons learned from completed and repeat hulls into standard planning templates.
  • Support development of historical schedule and productivity data for future estimating, capacity planning, and production forecasting.
  • Partner with Vessel Planners to improve forecast quality without taking ownership away from the detailed hull schedules.

Benefits

  • Medical Insurance: Comprehensive health insurance plans covering a range of services
  • Saronic pays 100% of the premium for employees and 80% for dependents
  • Dental and Vision Insurance: Coverage for routine dental check-ups, orthodontics, and vision care
  • Saronic pays 100% of the premium under the basic plan for employees and 80% for dependents
  • Time Off: Generous PTO and Holidays
  • Parental Leave: Paid maternity and paternity leave to support new parents
  • Competitive Salary: Industry-standard salaries with opportunities for performance-based bonuses
  • Retirement Plan: 401(k) plan with company match
  • Stock Options: Equity options to give employees a stake in the company’s success
  • Life and Disability Insurance: Basic life insurance and short- and long-term disability coverage
  • Pet Insurance: Discounted pet insurance options including 24/7 Telehealth helpline
  • Additional Perks: Free lunch benefit and unlimited free drinks and snacks in the office
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service