Information Systems Cost Estimator (Principal)

Torch Technologies, Inc.Kettering, OH
Onsite

About The Position

Torch Technologies has an exciting opportunity for a Cost Estimator (Principal) located in Kettering, OH (Dayton, WPAFB) to support our EPASS GB contract. As part of the AFLCMC/GB Business and Enterprise Systems Directorate, the Maintenance Repair and Overhaul Initiative (MRO) is a DOTMLPF-P transformation and standardization of both the business processes and enabling materiel solution which provides Air Force Sustainment Center (AFSC) with an integrated capability for planning, scheduling and executing organic depot maintenance to support agile planning, optimized workload assignment, resource allocation and integrated quality. The MRO materiel solution is a web-enabled system operating wholly within the .mil network. It implements a configured Oracle enterprise Business Suite (eBS) Commercial Off-The-Shelf (COTS) software product with 'complex MRO' being the core module for user interaction. This is supplemented with the integration of other necessary eBS suite modules plus Reports, Interfaces, Conversions and Extensions (RICE) objects which are deemed necessary to provide the required functionality. MRO implementation is divided into four software releases with capabilities to plan, schedule and execute organic depot maintenance processes within the commodities, electronics, missile and propulsion maintenance groups. MRO replaces dissimilar legacy systems and processes used across numerous geographic locations with a common enterprise business system that optimizes resource and workload assignments, facilitates what- if planning and frees-up logistics capacities aimed at improving capabilities availability to the warfighter. MRO operates within a Defense Information System Agency (DISA) hosted environment and interfaces with various legacy systems to support continuous operations within the depot maintenance environment.

Requirements

  • U.S. Citizenship
  • BS/BA/Masters with 24 semester hours in quantitative analysis courses which must include at least three semester hours of Calculus and three semester hours in Statistics.
  • Masters Degree in a related field with at least three years of IT management information systems acquisition cost analysis experience and two years of team management experience, OR Bachelor's Degree in a related field with at least ten years of IT management information systems acquisition cost analysis experience and two years of team management experience.
  • Possess the necessary expert experience to provide support in planning, organizing advising, and conducting IT management information systems cost estimating/training tasks in problem areas of moderate scope and complexity.
  • Have moderately extensive technical responsibility for interpreting, organizing, executing, and coordinating assignments.
  • Must have experience using the Automated Cost Estimating and Integrated Tool (ACEIT) Suite - Required
  • Must have experience building and communicating Program Office Estimates (POEs) – Required
  • Must possess and maintain a T1/NACI security clearance.

Nice To Haves

  • The problems are difficult to define and may require novel approaches and the use of sophisticated techniques.

Responsibilities

  • Manage, oversee/lead, or perform scientific work that involves designing, developing, and adapting mathematical, statistical, econometric, and other scientific methods and techniques.
  • Analyze management problems and provide advice and insight about the probable effects of alternative solutions to these problems.
  • Use routine cost estimating methods such as analogy, engineering or scientific methodology, and extrapolation.
  • Use cost estimating outputs to assess the impact various factors have on the costs to design, research, develop, operate, maintain, and dispose of a particular weapon system.
  • Analyze all elements affecting costs for a project of limited scope.
  • Analyze contractor financial data using EVM measures of merit to determine program viability with respect cost and schedule performance.
  • Use the ACEIT Tool Suite to perform all program office estimates which is mandatory use for working in the BES Directorate (AFLCMC/GB) for all information systems cost estimator positions (Junior, Journeyman, Senior, Principal, Hybrid).
  • Apply analytical processes, such as: Setting up the problem, Conducting background research, Collecting and reducing data, Displaying data for analysis, Formulating mathematical expressions, and, Drawing conclusions.
  • Keep abreast of new IT management information systems cost estimating methodologies, databases, and tools.
  • Make technical cost estimating decisions which are considered authoritative and demonstrate mature cost estimating judgment in anticipating and solving complex cost analysis problems.
  • Assess the cost and schedule implications of existing and projected technological advances.
  • Evaluate the impact of new and innovative acquisition strategies.
  • Build and communicate Program Office Estimates (POEs).

Benefits

  • ESOP participation
  • 401(k) match and safe-harbor contribution
  • medical
  • dental
  • vision
  • life insurance
  • short-term disability
  • long-term disability
  • flexible spending accounts
  • Health Saving Accounts and Health Reimbursement Accounts
  • EAP
  • education assistance
  • paid time off
  • holidays
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service