The Operator for the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project safely operates heavy equipment and trucks excavating, placing, receiving, loading, and transporting low-level radioactive waste tailings at the and Moab site. Equipment may include front end loader, water wagon, compactor, backhoe, excavator, dozer, 40-ton articulated dump trucks, reach stacker, water trucks, service trucks, etc.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
High school or GED