Field Superintendent

PREMIER UNDERGROUND CONSTRUCTION LLCGlendale, AZ
Onsite

About The Position

The Field Superintendent will be responsible for overseeing daily construction procedures to ensure quality and adherence to schedule. This role involves managing resources, coordinating with clients and subcontractors, ensuring safety protocols are followed, and reporting project progress. The Field Superintendent will perform duties at multiple job sites simultaneously, assessing construction progress, identifying conflicts, and communicating updates to the Project Manager.

Requirements

  • At least 5 years of experience working in dry utilities electrical industry.
  • At least 2 years of field foreman experience.
  • Knowledge of business and management principles involved in strategic planning, resource allocation, leadership techniques, production methods, and the coordination of manpower and resources.
  • Experience reading blueprints and electrical schematics.
  • Knowledge of materials, methods, and the tools involved in underground dry utilities and the electrical industry.
  • Understand the practical applications of engineering and technology including applying principles, techniques, procedures and equipment to the design and production of various projects.
  • Familiarity with the NEC, SRP/APS/Century Link/Cox Specifications
  • Knowledge and/or experience in operating excavating equipment and/or other heavy machinery.
  • Experience in effectively supervising other employees, at least 2 years.
  • Must have valid driver’s license (subject to approval of insurance broker).
  • Ability to communicate in a professional and tactful manner with others as a representation of the company.

Nice To Haves

  • High School Diploma is preferred however is not required.

Responsibilities

  • Assists the Project Manager in the preparation of a project including documentation, requirements, project layout, and developing a project schedule.
  • Attends pre-construction meetings with the Project Manager and the start of each project.
  • Oversees and assists the foreman in the confirmation of all located and marked utility lines.
  • Oversees the coordination of equipment and material requests and deliveries for necessity and efficiency.
  • Holds periodic briefings for field crew with tasks and expectations for that given project.
  • Oversees the job site for the overall condition and return of equipment, small tools, and materials after completion.
  • Maintains good communication with the Project Coordinator for inspections and material requests.
  • Engages with the client’s representative on the field periodically, quantifies the scope of work, and informs the Project Manager of any requested changes.
  • Ensures that all machinery and tools are available to the crew, and everything is in proper order and state of maintenance.
  • Oversees daily construction procedures to ensure that proper quality is maintained, and work is adhering to schedule.
  • Oversees progress prints, as-builts and progress pictures for accuracy and clarity.
  • Supplies Project Manager progress prints/as-builts daily through Field View.
  • Supplies Project Manager progress pictures weekly through Field View.
  • Meets with the Project Manager to discuss and strategize projects in preparation for Operations Department and Client meetings.
  • Attends Operations Department meetings frequently.
  • Attends all subcontractor meetings.
  • Performs Superintendent duties at multiple job sites, simultaneously.
  • Walks the site with the Project Manager and/or Client on a periodic basis for project updates and overall satisfaction of the client.
  • Oversees field crew and meets with Foreman to make sure all project specifications are strictly followed and within scope.
  • Oversees final walkthrough between Foreman and Clients.
  • Assesses construction site for conflicts in construction progress and communicates them directly to the Project Manager.
  • Communicates with the Project Coordinator for required inspections, submittals, and permits and materials.
  • Complete 9x9 forms for site visit reporting and communicating updates to the Project Manager.
  • Completes a minimum of ten site visits per week.
  • Requests field inspections by PUC Safety Representatives or Risk Management at random and without warning to field crew.
  • Oversees the cleanliness of work sites and inspects proper storage of hazardous material before and after daily tasks.
  • Oversees that all materials, supplies, tools, and equipment are procured in a time efficient manner.
  • Inspects daily excavation and adjacent area as well as protective systems inspection and submits findings to appropriate sources.
  • Monitors crew during working periods to evaluate safety practices and immediately correct those necessary.
  • Assist Foreman that all equipment and tools are in good condition before and after any departure from work site and reports findings to Logistics immediately if repairs or maintenance is needed.
  • Identify areas of work that are outside of the contracted scope and inform PM of changes.
  • Ensures the Foreman is completing and submitting daily trench logs, equipment logs, safety sheets and time entry daily and on time.
  • Ensures the Foreman is completing and submitting as-builts daily and progress pictures weekly.
  • Informs Foreman of all updates and changes resulting from the Operations and all other meetings.
  • Ensures to relay information to Foreman of updates/changes resulting from meetings.
  • Update Project Trackers – Daily
  • Create As-builds – Daily
  • Coordinate Multiple Jobs – As needed
  • Equipment Requests – As needed
  • Attend Operations Meeting – Daily
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service