The Epicor Kinetic Master Scheduler owns the plant’s production planning and scheduling in Epicor Kinetic. The role configures and runs finite and advanced scheduling, maintains the data that supports the schedule, and helps ensure the schedule is a practical, trusted tool for the shop floor. It serves as a link between planning, production, purchasing, and IT, and as the subject matter expert for how jobs are loaded, why dates change, and how scheduling settings and data can be adjusted to reflect actual operating conditions. The position supports realistic delivery commitments, capacity planning, material availability, and production reporting. It also builds scheduling-related reporting and provides training, documentation, and support for Kinetic processes and releases. The role leads continuous improvement efforts to reduce lead times and expediting and improve on-time delivery.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level