Provides technical support to engineers on a variety of technical tasks. Gathers, maintains, formats, compiles, and manipulates technical data, such as laboratory or material test results and engineering design changes. Produces engineering documentation, reports, drawings (flow charts, block diagrams, and schematics). Performs detailed mathematical calculations using established formulas; preliminary analyses of data where guidelines are provided in such areas as trajectory adequacy, model dimensional consistency; and quantitative judgments concerning technical data. Uses personal computer in performance of analyses and development of documentation/reports. May conduct tests and record data to assist with engineering evaluation or analysis. The following is a breakdown of what knowledge is needed for this job. PTD:The PTD is created to identify component level or misc. material needed to support the CVN68 and CVN78 working fleet. The PTD will consist of the component and all associated repair parts needed to support that component. Using multiple shipyard systems, technical personnel will locate the material needed for provisioning and retrieve all documents needed to begin this process, such as drawings (both NAVSEA and Vendor drawings), Tech Manuals, System Diagrams, I2 data, Specifications, etc. The technical personnel will input all needed data into the SLAN system and will need to know and understand the procedure prior to input. The technical personnel must also obtain a Confidential Clearance to access the SLAN. The PTD will be created by the technical personnel in the Enterprise Business System (EBS) in SLAN. When completed (checked by lead, review by the cognizant engineering) the completed package will be forwarded to NAVSEA for approval. During the NAVSEA approval process, the technical must be able to respond to NAVSEA engineer questions if contacted. LAR:This document is provided to CDA for action on issues when attempting to procure the material for stocking purposes or to provide Onboard Repair Part Support (OBRP). The LAR also is created and issued 7in the SLAN under the Consolidated Problem Reporting (CPR). The vendor may have issues with the ordering data or are providing submittal that have to be approved or there could be other issues that Logistic Tech person has to be resolve. When the Logistic Tech person receive the LAR, if it cannot be resolved in the Logistic group, you may have to contact engineering, the vendor or even NAVSEA to resolve the issue. The Logistic Tech person job is to attempt to resolve all issues in house with little outside assistance, if possible. This is also created in the SLAN under the Consolidated Problem Reporting (CPR).
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
Associate degree