This role reports to the Installation Department and participates in pre-commissioning and commissioning activities. Its goal is to provide Controls Engineering with systems that have been tested and are ready for more comprehensive controls functional commissioning and integration. The technician works with electrical installers and Controls Engineers to implement and validate material handling systems at customer sites throughout North America, ranging from simple to highly complex systems. The role includes loading emulated PLC programs, carrying out static functional testing against descriptions of operation and drawings, checking and validating system I/O and devices, and troubleshooting components and controls networks. The technician turns validated subsystems over to Controls Engineering using validation checklists and provides daily and weekly progress reports.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Education Level
Associate degree