About The Position

The AMHS track wiring and power-up scope typically includes, but is not limited to, the following work: Installation, support, and termination of bus bar and conductor systems feeding Muratec OHT/OHS track segments. Pulling and terminating 480V / 208V / 120V power feeders from designated panels to AMHS power supply units (PSUs) and track power injection points. Low-voltage controls, communication, and signal cabling (CAN bus, Ethernet/Profinet, fiber where applicable) between track segments, controllers, OCS (OHT Control System), and host MES interfaces. Grounding and bonding of track structure, support steel, and equipment per Muratec specs and NEC Article 250. Coordination of cleanroom-compatible cable management, including UPW-rated cable tray, stainless hardware, and approved penetrations through cleanroom walls and ceilings. Pre-energization checkout, megger testing, point-to-point continuity, phase rotation, and documented commissioning support alongside Muratec start-up engineers. Safe energization (power-up) of track sections in coordinated sequence with Muratec, including LOTO management and arc-flash precautions.

Responsibilities

  • Installation, support, and termination of bus bar and conductor systems feeding Muratec OHT/OHS track segments.
  • Pulling and terminating 480V / 208V / 120V power feeders from designated panels to AMHS power supply units (PSUs) and track power injection points.
  • Low-voltage controls, communication, and signal cabling (CAN bus, Ethernet/Profinet, fiber where applicable) between track segments, controllers, OCS (OHT Control System), and host MES interfaces.
  • Grounding and bonding of track structure, support steel, and equipment per Muratec specs and NEC Article 250.
  • Coordination of cleanroom-compatible cable management, including UPW-rated cable tray, stainless hardware, and approved penetrations through cleanroom walls and ceilings.
  • Pre-energization checkout, megger testing, point-to-point continuity, phase rotation, and documented commissioning support alongside Muratec start-up engineers.
  • Safe energization (power-up) of track sections in coordinated sequence with Muratec, including LOTO management and arc-flash precautions.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service