The Drill and Blast Planner provides engineering design, technical analysis, and short-term scheduling support for mine drilling and blasting activities. This role is responsible for ensuring that all drilling and blasting designs are engineered safely, optimized to technical specifications, and executed in compliance with regulatory standards to meet the continuous production needs of the Mine Operations department.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Entry Level
Education Level
Associate degree