The Facility Commissioning and Turnover (FCAT) unit manages commissioning and turnover documentation quality, completeness, and readiness. It ensures materials produced by the contracted Commissioning Agent (CxA) and contractors meet project standards and contractual requirements. The Document Control Professional oversees the flow, tracking, and organization of commissioning and turnover documents, including Cx plans, checklists, procedures, acceptance packages, and turnover artifacts. The role maintains document accuracy and consistency in systems such as Prolog, Kahua, and Cx Alloy; validates compliance with established commissioning processes; and coordinates with engineers, contractors, operations personnel, and the contracted CxA. This position supports documentation integrity throughout commissioning and turnover and helps deliver complete, traceable, and validated turnover packages.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level