This position directs the overall activities of Pedernales Electric Cooperative’s Transmission Planning department and transmission planning function. The Director provides technical leadership for transmission system planning, analysis, modeling, and interconnections in support of the Cooperative’s strategic initiatives. The role develops short- and long-term system-wide transmission plans and the electric transmission capital improvement plan, and oversees the evaluation and development of transmission facility improvements and additions. The position guides transmission interconnections and related system studies, supports Transmission Operations and regulatory filings, and helps ensure compliance with NERC Reliability Standards, ERCOT Protocols and Guides, and the Cooperative’s reliability requirements. It coordinates with internal departments, consultants, customers, members, developers, and government entities on projects. The Director also leads and supervises department staff, manages the department budget and procedures, and provides engineering support to other departments. The position is based at the physical office at 120 Cottonwood Creek Trail, Building A, Cedar Park, Texas 78613. The posted minimum starting base pay is $173,200, with a midpoint of $216,500; KPI bonuses and competitive benefits are also mentioned. Starting pay within the full range may vary based on experience, job-related skills, and relevant education or training. The position is open until filled.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Director