Data Center Construction Site Foreman (Dallas)

Lambda
•$132,000 - $176,000•Onsite

About The Position

Lambda, The Superintelligence Cloud, is seeking a Data Center Construction Site Foreman to be the on-site lead for assigned data center projects. This role involves daily command of colocation white space fit-outs, high-density compute expansions, and infrastructure upgrades. The Foreman will work under the Data Center Implementation Manager and alongside the Data Center Implementation Project Manager to ensure projects are completed according to drawings and schedules. Responsibilities include directing trade crews and vendor teams, sequencing work across various disciplines (electrical, mechanical, low voltage, network), enforcing safety and quality standards, managing material flow, identifying and resolving field conflicts, and maintaining daily records of site activities. The role requires a strong understanding of data center construction and installation processes, with a focus on safety, quality, and efficient execution in live environments.

Requirements

  • High school diploma or equivalent required.
  • 5+ years of construction field experience, including 2+ years in a foreman, lead, or superintendent capacity.
  • Direct experience with data center white space fit-out, critical facility construction, or comparable industrial and mission-critical installation work.
  • Working knowledge of electrical, mechanical, and low voltage systems and installation practices, including power distribution, cooling, containment, and cabling.
  • Ability to read and interpret construction drawings, specifications, submittals, and installation instructions, and to produce accurate redlines.
  • OSHA 30 certification required or obtained within 90 days of hire.
  • Familiarity with commissioning processes, pre-functional checklists, and punch list closeout.
  • Comfortable with field reporting tools and project platforms (e.g., Procore, Smartsheet, MS Project, Monday.com) and with mobile photo documentation.
  • Able to lift, climb, work at height, and remain on foot in active construction environments for extended periods.
  • Willingness to travel to and work within active construction sites (~75%), including off-hours and weekend work during critical activities.
  • Committed to safety, quality, and continuous improvement in field execution practices.

Nice To Haves

  • Completed trade apprenticeship, journeyman license, technical certification, or associate degree in a construction or engineering discipline strongly preferred.
  • NFPA 70E familiarity preferred.
  • First Aid and CPR certification a plus.

Responsibilities

  • Serve as Lambda’s on-site lead for assigned data center projects, directing daily activity across MEP contractors, low voltage and network installers, rack and integration crews, and OEM field service teams.
  • Run daily huddles, set the day’s priorities, and confirm each crew knows its scope, sequence, and constraints.
  • Oversee physical execution of white space fit-out work including rack and cabinet setting, containment, busway and branch circuit distribution, rPDU installation, cable tray, structured cabling, liquid cooling and CDU tie-ins, and airflow management.
  • Verify installations match approved drawings and Lambda standards before work is covered or energized.
  • Enforce site safety requirements, energized work permits, LOTO procedures, hot work permits, and PPE compliance.
  • Conduct daily safety walks, stop unsafe work immediately, and lead incident and near-miss reporting with the data center provider and general contractor.
  • Perform in-progress and pre-cover inspections, torque and terminations checks, labeling verification, and workmanship reviews.
  • Build and drive punch lists to closure, rejecting non-conforming work and confirming corrections in the field.
  • Deconflict overlapping trade work, sequence access to shared space and shafts, and coordinate outage and switching windows with the data center provider.
  • Escort and manage vendor access, badging, tool and material handling, and site rules compliance.
  • Receive, inspect, stage, and secure OFCI (Owner-Furnished, Contractor-Installed) equipment.
  • Verify shipments against packing lists and submittals, document damage and shortages immediately, manage laydown and storage areas, and confirm material readiness ahead of each install window.
  • Own the three-week lookahead in the field.
  • Track daily progress against the construction schedule, flag manpower and material gaps early, and provide the Implementation Project Manager with accurate percent-complete and constraint data.
  • Produce daily field reports covering manpower counts, work completed, deliveries, delays, safety observations, and photo documentation.
  • Maintain redline markups, RFI and field observation logs, and as-built notes for turnover.
  • Resolve constructability conflicts and field questions at the site level where possible.
  • Generate clear RFIs with photos and drawing references when a design or scope decision is needed, and escalate cost, schedule, or safety impacts without delay.
  • Support pre-functional checks, Level 1 through Level 4 commissioning activities, and integrated systems testing.
  • Coordinate contractor availability for scripts, witness testing where directed, and drive open-item closure through final acceptance and handoff to Data Center Operations.
  • Work closely with Network Engineering, Data Center Operations, HPC, Supply Chain, and Technical Project Management to ensure deployment, cabling, and hardware install activities are sequenced correctly and space is turned over ready for GPU deployment.

Benefits

  • Generous cash & equity compensation
  • Health, dental, and vision coverage for you and your dependents
  • Wellness and commuter stipends for select roles
  • 401k Plan with 2% company match (USA employees)
  • Flexible paid time off plan that we all actually use
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service