Construction Scheduling Analyst 3 – Airports, Energy & Infrastructure

ConnicoNashville, TN
$90,000 - $110,000Hybrid

About The Position

Connico is seeking a Construction Scheduling Analyst 3 to join their team, focusing on complex, high-impact airport, energy, and infrastructure projects. In this role, you will be responsible for schedule analysis, directly influencing the sequencing and delivery of multi-million-dollar programs. This position offers the opportunity to own scheduling work, identify and resolve sequencing conflicts, and communicate findings to both internal teams and clients. The ideal candidate is proficient in Primavera P6 and ready to take on independent analysis responsibilities.

Requirements

  • 3-5+ years of progressive construction scheduling experience, including independent execution of schedule updates and logic reviews.
  • Bachelor's degree in construction management, engineering, quantity surveying, architecture, or a related field, or equivalent working knowledge.
  • Proficiency in Primavera P6.
  • Ability to read and interpret architectural and engineering drawings and specifications at a ROM level with minimal oversight.
  • Strong command of production rates, WBS development, baseline assignment, and variance analysis.
  • Proficiency in Microsoft Office, including Excel, Outlook, Word, and Teams.
  • Some travel required: 10-25% (site visits, client meetings, conferences).

Nice To Haves

  • Certification such as PMI-SP, PSP, AACE CCT, or equivalent.
  • Familiarity with Time Impact Analysis (TIA), EVM reporting, and project controls terminology.
  • Experience performing or contributing to cost and schedule risk assessments (CSRA).
  • Experience with Oracle Primavera Cloud (OPC), Power BI, and Adobe Acrobat.
  • Experience contributing to schedules on multi-phase or complex programs.
  • Experience in Aviation, Energy (commercial nuclear power generation, green and renewable power generation, power distribution, and power transmission including high voltage), Data centers and data infrastructure, or Government and military scheduling.

Responsibilities

  • Build detailed construction schedules using Connico's templates and standards, incorporating durations, sequencing logic, and constraints derived from design documents, client requirements, and construction methodology.
  • Independently create and manipulate work breakdown structures to align with internal, project, and client-specific needs.
  • Contribute to resource- and cost-loading, assign baselines, determine variances, and provide recommendations.
  • Develop production rates from historical project data with increasing independence.
  • Support phasing and sequencing plans, and contribute inputs to Monte Carlo simulations and risk matrices.
  • Review architectural, engineering, and civil drawings and specifications to identify sequencing needs, scheduling impacts, and conflicts.
  • Identify gaps, inconsistencies, and phasing challenges, proposing solutions.
  • Develop schedule assumptions, milestone summaries, sequencing notes, and value engineering ideas for client deliverables.
  • Prepare visual schedule outputs and QA reports using P6 exports, Excel, Power BI, and Connico formatting standards.
  • Communicate schedule assumptions, progress, risks, and changes clearly to internal and external stakeholders.
  • Participate in schedule review, update, and reconciliation meetings, ensuring accurate documentation and version control.
  • Support the development of junior analysts by reviewing their methods, activity lists, and outputs.
  • Contribute to internal templates, training materials, and sequencing checklists.

Benefits

  • Base salary $90,000-110,000
  • Bonus opportunities (commensurate with experience)
  • Opportunity to work on complex, high-visibility airport, energy, and infrastructure projects
  • Strong culture of collaboration, respect, and technical excellence
  • A clearly defined career path and development support
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service