Construction Scheduler

Hoffman Construction CompanyClaude, TX
Onsite

About The Position

The Construction Scheduler will work within the Scheduling department and will report to the Scheduling Manager. Utilizing their ability to make sense of large quantities of complex data, the Scheduler will work closely with the Project Managers and Project Superintendents to input schedule status updates, incorporate logic changes and delays, and analyze project schedule progress. To support a collaborative, and team-focused environment, the construction scheduler will be based fully in person at the project site near Amarillo, TX.

Requirements

  • A minimum of two (2) years’ construction project scheduling experience with Primavera software (P6) required.
  • High School Diploma or GED required.
  • Bachelor’s degree in Civil Engineering, Construction Management, Architecture, or equivalent degree/certification and/or equivalent related work experience in data management required.
  • Educational background in materials and methods of construction.
  • Experience with project management software such as Primavera Project Planner (P6), Procore, Bluebeam, and Microsoft Project.
  • Proficient in Windows and Microsoft Office 365 (Excel, Word, Outlook, Power Point and Teams), and have a general understanding of working within a computer network.
  • Experience with design software such as AutoCAD, Revit and Navisworks.
  • Training in design and construction document reading, design specifications, survey theory and techniques.
  • Experience in organizing technical data in a neat and accurate method.
  • Familiar with CSI specification system for construction.
  • Demonstrate a thorough understanding of all aspects of low voltage electrical construction.
  • Highly developed visual observation and interpretation skills.
  • Ability to work well and maintain a cooperative attitude through high-pressure situations.
  • Excellent time-management skills and ability to multi-task and prioritize work while frequently interrupted by phone calls and questions on work in progress.
  • Excellent written and oral communication skills with an ability to develop strong interpersonal relationships.
  • Ability to work closely with a variety of trade and craft people in a field work situation.
  • Patience and professionalism are essential.
  • Must be a strong team player with the ability to collaborate with various personnel within and across departments and at all levels of leadership.
  • Constant mental alertness, accuracy, and attention to detail required.
  • Must be able to work independently, make decisions, and follow through on all assignments.
  • Must use creativity, independent judgment, and organizational and problem-solving skills to determine the best method to accomplish desired results.
  • Must be able to plan and organize work.
  • Must possess strong organizational and computer use skills and have a high level of competency to read/write/speak English, interpret construction related documentation and communicate with coworkers.

Nice To Haves

  • Specific experience in industrial and/or hi-tech semiconductor manufacturing projects is preferred.

Responsibilities

  • Collect and input schedule status update information into the record project schedule.
  • Attend project schedule progress meetings as needed.
  • Identify changes to the project schedule.
  • Notify teams of impacts to critical path activities and/or schedule logic.
  • Ensure technical schedule integrity is maintained.
  • Produce and distribute weekly and monthly schedules, forecasts, and reports.
  • Manage Outlook distribution lists and standard form emails for schedule distribution.
  • Maintain project schedule archives and documentation.

Benefits

  • Incentives
  • per diem
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service