Consertus is seeking an experienced Construction Scheduler to support Los Angeles Metro with project scheduling and controls services for major transportation infrastructure work. This is a heavy civil infrastructure assignment with anticipated scope that may include civil construction, utilities, roadway improvements, roadwork, and pavement activities. The Construction Scheduler will develop, maintain, update, and analyze detailed, logic-driven schedules to support project planning, construction execution, progress measurement, schedule forecasting, and performance reporting. The ideal candidate brings extensive experience supporting large-scale heavy civil, highway, rail, transit, or Bus Rapid Transit (BRT) projects, along with advanced expertise in Primavera P6. Experience supporting CMGC (Construction Manager/General Contractor) or similar alternative project delivery methods is strongly preferred. This position is hybrid in the Los Angeles area, with onsite attendance required based on project and client needs.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Senior