Construction Scheduler (Mission Critical

Barton MalowSterling, VA
Hybrid

About The Position

Scheduler is typically assigned to large complex and fast paced construction projects which require hybrid work on the job-site. Willingness and enthusiasm to work on-site directly with the project team is critical. Must be a flexible and adaptable team player, as well as have strong communication and client service skills. Must develop relationships with operational personnel to drive process and deliver results.

Requirements

  • 6 Years of Planning & Scheduling experience related to engineering or construction
  • Proficient with Oracle P6 Professional
  • Intermediate skills in MS Office skills, Word, Excel, Outlook, and Internet Explorer
  • Basic skills in Bluebeam, Autodesk Build and Box
  • Ability to effectively manage and communicate workload with all members of the team.
  • Effective time management and organizational skills while paying attention to detail
  • Ability to identify, track, and complete work tasks in a timely manner

Nice To Haves

  • Mission Critical//Data Center Project experience preferred and desired, but not required.

Responsibilities

  • Leads planning & scheduling efforts and assists project teams in the preparation of project schedules and has ability to progress schedule status that facilitates subcontractor and owner reporting
  • Has ability to establish baselines, draft narratives and perform variance, float and delay analysis
  • Ability to forecast a project from a schedule perspective and align with cost and manhour projections
  • Drive change management process to properly document scope and/or unforeseen changes related schedule on each individual project, assisting with the incorporation of fragnets and TIA preparation
  • Clearly communicate when risk factors arise on a project to on-site personnel and/or upper management to ensure proactive action is taken.
  • May supervise and mentor Planning & Scheduling team members
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service