Carpenter Foreman

Pepper ConstructionIndianapolis, IN
Onsite

About The Position

Carpenters are responsible for building forms, bracing, shoring, and other support structure in the construction of various commercial buildings. This would include, but is not limited to office buildings, schools, religious facilities, and health care facilities. Performs tasks as determined by a specific job site. This is a union position. Please contact the Carpenters union to get signed up PRIOR to applying.

Requirements

  • Must contact the Carpenters union to get signed up PRIOR to applying.

Responsibilities

  • Building forms, bracing, shoring, and other support structures in the construction of various commercial buildings.
  • Performing tasks as determined by a specific job site.
  • Erecting, installing, and repairing all structures, fixtures, false work, and formwork made of wood, steel, aluminum, or any other materials.
  • Wrecking of all formwork and reusable materials.
  • Decking installation.
  • Concrete pour watching.
  • Rigging and signaling of heavy equipment.
  • Driving of all piling, including auger cast piling.
  • Building structures to retain materials during excavation.
  • Reading blueprints.
  • Performing layout of projects and materials.
  • Operating transit, optical level, and laser equipment.
  • Setting of batter boards and grade stakes.
  • Wire mesh laying.
  • Setting and placing of all precast concrete materials and temporary wire walls.
  • Operating air, power tools, and power equipment.
  • Setting of all screeds or rails for pouring of concrete or any other materials.
  • Chute building.
  • Setting of trailers.
  • Building of temporary structures.
  • Welding and cutting torch operation.
  • Setting of all lagging.
  • Scaffold and ladder erection.
  • Handrail erection.
  • Setting of all products attached to formwork whether made of steel, plastic, or any other materials.
  • Installing curb angle, angle iron, weld plate, anchor bolt, and slip rod.
  • Framing of all interior or exterior walls.
  • Installation of all ceilings.
  • Hanging of all wall board, siding, and paneling.
  • Installation of all partitions.
  • Installation of all decorative wall moldings, panels, and trim work made of wood, plastic, or other composite materials.
  • Installation of all framework and trim materials for toilets and bathrooms made of wood, metal, or plastic or other composite materials.
  • Installation of bathroom partitions, blocking, furring, lathe, black iron, and louvers not attached to duct work.
  • Handling of finish materials.
  • Installation of all doors, hardware, shelving, frames, displays, and exhibits.
  • Installation of acoustical materials and products.
  • Installation of insulation and computer flooring.
  • Performing all other work associated with construction, erection, installation, or repair of structures and fixtures of wood, plywood, concrete, gypsum, and wallboard.
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service