Analyst, Materials Planning, SIOP

RTX•El Segundo, CA
•$62,900 - $119,700•Onsite

About The Position

Raytheon is seeking an Analyst, Materials Planning, SIOP to join its Production Control organization in El Segundo, California. The successful candidate will transact and execute in Material Requirements Planning (MRP) and Shop Floor Control systems to align material availability, production schedules, and contractual requirements. The role works closely with operations, factory, supply chain, engineering, and quality teams to support effective program execution. This is an onsite role at the El Segundo facility. The position requires U.S. citizenship and an active, existing DoD Secret security clearance after day one, as well as the ability to obtain and maintain a U.S. government-issued security clearance.

Requirements

  • Typically requires a university degree or equivalent experience and less than 2 years of prior relevant experience.
  • Experience with Microsoft Office 365.
  • U.S. citizenship is required because only U.S. citizens are eligible for the required security clearance.
  • Must be able to obtain and maintain a U.S. government-issued security clearance; an active and existing DoD Secret clearance is required after day one.

Nice To Haves

  • Experience in planning, scheduling, production control, supply chain, manufacturing, purchasing, economics, and/or operations.
  • Experience with MRP systems.
  • Experience in a lab environment, warehouse, live production floor, event planning, floor restocking, and/or merchandise purchasing.
  • Excel experience, such as pivot tables, VLOOKUP, or index match.

Responsibilities

  • Provide status updates on work in progress, material availability, and potential production problems to ensure personnel, equipment, materials, and services are available as needed.
  • Attend and support tier meetings as necessary.
  • Achieve organizational key performance metrics for the assigned product line.
  • Prepare purchase requests for components based on the master production schedule, shop load, and inventory requirements.
  • Work with program support staff to resolve material shortages and other issues affecting product builds.
  • Report on and troubleshoot MRP system-generated exceptions, taking corrective action on unfavorable trends as necessary.
  • Conduct inventory checks and reconcile the system.
  • Move materials to and from the warehouse, factory, pack/ship, or other areas as needed.
  • Physically and systemically kit work orders and production materials for a high-mix, low-volume manufacturing environment.
  • Stock subassemblies, conduct routine and ad hoc cycle counts, and deliver materials to production work centers.
  • Monitor and replenish factory point-of-use inventory, including common-use consumables and program-specific materials; collaborate with production personnel to identify shortages, resolve discrepancies, and maintain material availability.
  • Work with manufacturing technicians and manufacturing engineering to support the suspension, evaluation, disposition, and potential rework of nonconforming or discrepant materials.
  • Receive and respond to requests for support from factory supervisors, leaders, and technicians.

Benefits

  • Medical insurance
  • Dental insurance
  • Vision insurance
  • Life insurance
  • Short-term disability insurance
  • Long-term disability insurance
  • 401(k) match
  • Flexible spending accounts
  • Flexible work schedules
  • Employee assistance program
  • Employee Scholar Program
  • Parental leave
  • Paid time off
  • Holidays
  • Potential eligibility for annual short-term and/or long-term incentive compensation programs
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service