Airport Planning Project Coordinator

City of Charlotte
Onsite

About The Position

The Airport Planning Project Coordinator aids the Planning Program Manager by performing technical work on complex planning tasks at Charlotte Douglas International Airport. Work involves extensive contact with both internal and external groups, agencies, stakeholders, and community groups.

Requirements

  • Bachelor's Level Degree plus three years of experience, or; Master's Level Degree plus one year of experience
  • Thorough knowledge of the theories, methods, and procedures involved in airport planning, including knowledge of FAA Advisory Circulars, planning requirements and design standards, including land development principles and practices.
  • Thorough knowledge of the theories, methods and procedures involved in planning, with an emphasis on aviation planning, operations or design.
  • Considerable knowledge of the planning principles and practices of airport-compatible land use, and comprehensive planning and design standards.
  • Considerable knowledge of research methods and the application of them to planning problems.
  • Ability to prepare complex planning analyses and comprehensive reports.
  • Ability to present on planning topics or planning overviews.
  • Ability to read and understand basic design documents
  • Excellent public speaking and professional writing skills.
  • Ability to convert broad program issues to a work program level.
  • Ability to maintain a customer service orientation in all circumstances.
  • Ability to work in team settings or autonomously on specific tasks
  • Knowledge of or ability to learn Microsoft Office Suite, Bluebeam software, or Adobe Creative Suite
  • Valid driver’s license with no more than 6 points, with the ability to obtain and maintain a city driving permit.
  • Positions in this class typically require grasping, stooping, squatting, kneeling, crouching, reaching, pushing, talking, hearing, seeing, and repetitive motions.
  • This position requires the ability to drive and conduct field work requiring walking substantial distances over sometimes difficult terrain with possible exposure to inclement weather. Must be able to lift up to 25 lbs. in order to carry equipment, laptops, etc. There are also periods of sedentary desk work which may require long periods of sitting.
  • Essential and marginal functions may require maintaining physical condition necessary for sitting, standing, climbing, or walking extended periods of time
  • Light to moderate lifting and carrying; some crouching, stooping, squatting, crawling, reaching, pushing, and pulling when performing tasks
  • Adequate vision, hearing, and speech required
  • Concentrated and attentive use of one or more senses (visual, audio, and other sensory modalities) for proofreading, data entry, tabulating data
  • Ability to operate in an environment with frequent interruptions from people and/or noises, which in return could result in some level of stress, fatigue, or strain
  • Comprehension of written information in work-related documents
  • Ability to hear, understand, and distinguish speech

Nice To Haves

  • Bachelor’s degree plus three years of airport-related experience, or; Master’s degree plus one year of airport-related experience
  • Any equivalent combination of training, education, and minimum five years of airport-level experience that provides the required skills, knowledge, and abilities.

Responsibilities

  • Develops planning programs, compiles and analyzes planning data. Assists with the development and management of the Airport’s Capital Improvement Program for a near-, short-, and long-term horizon.
  • Researches and prepares reports and plans to support complex issues, such as the Airport Master Plan and Strategic Area Development Plan, noise programs, Passenger Facility Charge (PFC) and Airport Improvement Program (AIP) purpose and need statements, National Environmental Protection Act (NEPA) documentation, site and area development planning, compatible land use plans, airfield capacity, terminal capacity, economic development plans, benefit/cost analyses, sustainability reports/plans, Part 150 documentation, facility and infrastructure requirements analyses, project programming documentation, facility use surveys and analyses, geospatial analysis, concept design and development. Prepares preliminary sketches of future projects.
  • Coordinates planning and construction projects with other departments and public agencies.
  • Provides technical support on planning principles.
  • Presents plans or project overviews to public groups including the Airport Community Roundtable, Airport Neighborhood Committee, and the Aviation Academy.
  • Coordinates the preparation of reports and informational material for internal and external stakeholder groups.
  • Collaborates with Finance to maintain working planning documents. Assists Financial Planning with providing project information to supplement grant administration. Provides guidance for project funding eligibility sources, including but not limited to Airport Improvement Program, Passenger Facility Charge Program, state grants, NC Highway Department funds,
  • Coordinates with internal stakeholders for the purposes of land acquisition, land use, and land disposal
  • Coordinate with state and federal agencies throughout the project life cycle.
  • Drafts requests for qualifications. Reviews Statements of Qualifications and participates on the selection committee for professional services.
  • Serves as a project manager overseeing Planning consultant-led tasks and projects supporting the scoping, fee negotiation, data collection, and ongoing project management process. May serve as a deputy project manager or support the Planning Program Manager on larger-scale complex projects.
  • Participate in design teams to represent the original planning principles to ensure the projects proceed to meet the original purpose and need.
  • Prepare or assist departments to prepare Project Definition Documents in support of new and changing project requests to provide an overview of a project scope, cost, and schedule that is then shared and coordinated with our Architecture and Engineering partners when transitioning projects from a Planning to Design phase.
  • Serve as a liaison between airport tenants, internal and external stakeholders regarding aeronautical topics
  • Serve as an Airport representative or designee on internal and external committees to ensure planning principles are represented and served through its actions.
  • Assist the internal Airport Governance process with the compilation, research, and coordination of Airport projects and associated project changes.
  • Part 77 airspace analysis
  • Knowledge of town/city/regional planning practices and design strategies
  • Knowledge of air traffic functions, policies, procedures, and best practices
  • Performs site visits to future and current construction projects
  • Maintains the ability to safely drive on the Airport’s Movement and Non-movement areas.

Benefits

  • Comprehensive benefits package
© 2026 Teal Labs, Inc
Privacy PolicyTerms of Service