RECORDS AND REPORTS Detailed daily reports shall be prepared for each inspection and test by the Special Inspector and Testing Laboratory. Reports shall include: Date of test or inspection Name of Inspector or Technician Location of specific areas tested or inspected Description of test or inspection and results Applicable ASTM standard Weather conditions Inspector signature Any discrepancies from the Contract Documents found during a Special Inspection shall be immediately reported to the Contractor. If the discrepancies are not corrected, the Special Inspector shall notify the Contractor QC Manager. Reports shall document all discrepancies identified and the corrective action taken. At the completion of the work requiring Special Inspections, the Special Inspector shall provide a statement to the Contractor and Designer of Record that all work was completed in substantial conformance with the Contract Documents and that all appropriate inspections and tests were performed.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Education Level
No Education Listed