Job Summary: This individual will be responsible for planning, organizing, and maintaining the Shop Floor Schedule (SFS). The SFS is a planned production assembly schedule, in weekly capacity-constrained sections, that is derived from the Master Production Schedule (MPS). The goals of the Production Scheduler are production efficiency, velocity, and on-time completion of Shop Operations and Shop Orders to Original Customer Promise (OCP). The Production Scheduler works together with the Master Scheduler to ensure plant loading that results from the SFS neither under (passing up capacity) or over loads available capacity (causing late deliveries to OCP). The Production Scheduler also works together with Manufacturing Engineering, Purchasing, and Material Analysts to ensure plant loading from the SFS takes into consideration material availability.
Stand Out From the Crowd
Upload your resume and get instant feedback on how well it matches this job.
Job Type
Full-time
Career Level
Mid Level
Industry
Utilities
Number of Employees
5,001-10,000 employees