Data Center White Space Fit Out - Project Manager

Align CommunicationsPhoenix, AZ
49dOnsite

About The Position

Align offers a wide variety of services centered around the data center white space. We are a white space fit out general contractor who manages the entire fit out of data centers across the country. Our services include designing layouts, overhead support systems (to support cable pathways and electrical systems), power striping/redundancy planning for distribution from PDU’s to cabinet receptacles, conduit pathways, and low voltage structured cable infrastructure. As a Data Center Construction Project Manager, you will guide the build of electrical and mechanical distribution from the upstream critical equipment for delivery to compute/storage/network infrastructures. This role is to understand the design intent and customer expectations and will be responsible for making it happen! You will be onsite daily interacting with the construction trades/sub contractors and will be directly responsible for managing schedule/QC in the field. This is a full-time salaried position offering competitive compensation, comprehensive benefits, paid time off, paid training and performance-based bonuses. This position is based in the Phoenix, AZ area and will often work onsite for local data center projects. Overnight travel outside of the area will be on an as needed basis. This is a full-time salaried position offering a base commensurate with experience, performance based bonuses, comprehensive benefits, paid time off, and paid training.

Requirements

  • Bachelor’s degree in Mechanical Engineering, Electrical Engineering, Construction Management or an equivalent engineering science OR 5+ years of related construction management experience in lieu of a degree
  • 5+ years of experience in construction management of large, complex mission critical projects involving large-scale mechanical, electrical and plumbing (MEP) plants – Some Data Center White Space Construction experience is preferred
  • Strong general contractor and vendor management experience (request for proposals, bidding, change orders, quality control, RFI/submittal tracking) associated with construction and project execution
  • Possess strong documentation skills, clear written and verbal communication skills, and ability to use data to justify conclusions
  • Able to read and interpret construction specifications and drawings for all disciplines
  • Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, and OSHA
  • Must be able to travel as needed

Nice To Haves

  • Understand electrical and mechanical principles relating to data centers
  • Experience with Procore or similar project management software
  • Knowledge of the local subcontractor (the quality of their work) and relations with local low voltage, electrical and mechanical contractors is strongly preferred
  • Experience directly related to the design or construction of data centers/critical infrastructure or large-scale mechanical and electrical plants

Responsibilities

  • Directly interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases
  • Monitor the progress of each project through updated schedules, communicates changes and manages client expectations - identify and negotiate time extensions where justified and allowed
  • Construction project management for specific initiatives aimed at increasing the resiliency of our data centers
  • Resolve scope problems with subcontractors and trades
  • Construction document management including submittal review, RFI’s, change orders, and invoicing
  • Construction project quality control
  • Record and report key construction metrics to team members and management.
  • Drive teams to perform troubleshooting and root-cause failure analysis associated with equipment failures

Benefits

  • competitive compensation
  • comprehensive benefits
  • paid time off
  • paid training
  • performance-based bonuses
© 2024 Teal Labs, Inc
Privacy PolicyTerms of Service